pipework
Help and information on all topics relating to your central heating, air conditioning and ventilation issues.

Hangela28
Labourer
Labourer
Posts: 1
Joined: Mon Feb 14, 2011 8:28 am

pipework

by Hangela28 » Mon Feb 14, 2011 8:46 am

looking at installing a electric wet heating system and have been advised that I can save money by using plastic pipework throughout with only copper for the inital connection to the boiler I have always used copper and am wondering if this could be the way to go as it will save me a small fortune on the intall
my only worry is that this might not be as reliable as copper some advice would be helpful thank you