When installing a flue liner is there a minimum high from the roof that it must protrude using a macflash or similar.
The existing chimneyhead was removed below roof hight and would need to have steel upright inserted out through the tiles/slates.
by raeargyll » Thu Feb 17, 2011 9:56 pm
by stoneyboy » Fri Feb 18, 2011 6:40 pm
by welsh brickie » Sat Feb 19, 2011 4:49 pm
by Perry525 » Thu Mar 03, 2011 7:09 pm