Well where to start, i am doing out the upstairs of our 3 bed house and as a keen diyer i am going to try and do as much of the work as i can.
My problem is untll the upstairs is boarded out the family is going to have to move out, and i only have limited time off work.
I know it is very subjective and obviously i wouldnt be able to do the job as quick as you guys would, but would you guys be able to give me a rough estimate of how long it would take to do?
Im doing out 3 rooms (bathroom is for a later date), all of which are square except for one wall with a chimney breast. In each room i plan to remove all of the old failing plaster on all walls back to the bricks and then dot and dab them.
The room dimensions are as follows:
1. 4.3m x 3m
2. 3m x 3m
3. 5.6 m x 4m
I know its impossible to be exact in any way, but can you give me any ideas how long you think it should take? I would class myself as competent, and will be putting a full days work as it were.
Or out of a matter of interest how long do you think it should take if i get someone in? As due to time constraints i might have to go down that route