by ammo »
Tue Jul 17, 2007 10:36 pm
hi mark
surrey flange in the top is easier than drilling in the side of the cylinder and fitting the ******* one. Or you can make it the first connection off the 22mm pipe from the cyllinder on the top to where it drops vertically down. But you must use a 22m tee on the horizontal piece only. And from that tee go down and the up to the loft.
ammo