tiling over breeze block
Advice and information on tiling and fixing tiles to a variety of surfaces

2 posts   •   Page 1 of 1
jtat76
Labourer
Labourer
Posts: 1
Joined: Wed Jul 18, 2007 12:21 pm

tiling over breeze block

by jtat76 » Wed Jul 18, 2007 12:59 pm

Hi, is advisable to tile straight onto breeze block or should I plaster 1st. Also if i have to plaster, how long do i need to leave it b4 i can tile over.
Thanks

martin497
Apprentice
Apprentice
Posts: 18
Joined: Mon Jul 02, 2007 5:21 pm

tiling on bare blocks.

by martin497 » Wed Jul 25, 2007 5:38 pm

Hi jtat76, you cannot tile onto bare brick or blockwork walls.
Have the walls plastered and the you must wait at least 4 weeks before tiling.

2 posts   •   Page 1 of 1
It is currently Wed Nov 27, 2024 4:35 am