Concrete a wall
All manner of questions and solutions to problems and issues surrounding the subject of brickwork, blockwork and stonework

2 posts   •   Page 1 of 1
graham_woodwarduk
Labourer
Labourer
Posts: 3
Joined: Wed May 16, 2012 4:18 pm

Concrete a wall

by graham_woodwarduk » Thu May 17, 2012 11:10 am

Hi,

I recently had a new damp proof applied to an internal wall and in order to have the damp proof done I had to remove the old plaster/concrete down to the brick work.

I plan to re-concrete this at the weekend and was hoping for some useful tips.

What kind of mix ratio should I use?
The engineer who done the damp proofing suggested using a 4:1 mix with a water proofer as well?
How do I stop cracks appearing?
Do I need to do anything to the exposed brick work prior to adding the concrete? (e.g. wet the walls?)

Thanks for any tips,
Graham

Super chip
Labourer
Labourer
Posts: 2
Joined: Fri Jun 08, 2012 9:17 pm

Re: Concrete a wall

by Super chip » Fri Jun 08, 2012 10:19 pm

Pva the area first and then "dub out" the wall (fill any deep voids e.g mortar joins, broken bricks). Allow to dry and then do a full coat of render adding the waterproofer. All this should be done with the reccommended 4-1 mix, once semi dry key the surface. Then add a top coat of render once dry, but make this coat a 5-1 mix to avoid cracking.

2 posts   •   Page 1 of 1
It is currently Fri Nov 15, 2024 5:55 am