Hi,
Can anyone advise what procedure I should follow to recharge an arrestor on an open system, i.e. a system that feeds the cold taps, an instant shower, a toilet cystern and also provides the feed to obtain hot water from the combi boiler. The arrestor is, I believe, located on the cold feed pipe that divides into two branches, with one side going to the combi boiler and the other side going to the instant shower.
I've tried uploading a photo of the pipework showing the arrestor without success. A photo of my set up can be seen at:
http://tinyurl.com/mky564g
(If that link doesn't work please copy it and paste it into your browser.)
Many thanks.