Hi all,
I have a 9.5kw triton opal shower which was installed professionally in 2001 but has stopped working. Id like to replace it with a Mira Sport 9kw shower and Im wondering what, if anything, do I need to change with the wiring?
The main board is new. The shower is connected to a 32A MCB and a 30mA RCD. The cable is 10mm2 and travels about 3m through hollow walls. It passes through a pull cord switch outside the bathroom, which i guess is a double pole switch for the 9.5kw rated shower.
My questions are:
What, if anything, do I need to change in the wiring? In particular, does the MCB need to be changed to a different A rating?
If i need to change the MCB do I have to isolate the mains at the meter, or just the main switch?
Can I do this work and replace the shower myself? Do I need to get it inspected afterwards?
What kind of earthing?straps should there be on the shower piping?
Thanks for any advice