S-Plan Heating Wiring Problem With Boiler Pump Still Running
Help and information on all topics relating to your central heating, air conditioning and ventilation issues.

2 posts   •   Page 1 of 1
Darrenb73
Labourer
Labourer
Posts: 1
Joined: Sat Jun 02, 2018 10:07 pm

S-Plan Heating Wiring Problem With Boiler Pump Still Running

by Darrenb73 » Sat Jun 02, 2018 10:14 pm

I have completed my S plan heating wiring system. The hot water and heating motorised valves both work correctly when demand is needed. When no valves are calling for heat, the boiler pump still runs and when the boiler temp drops it fires to maintain temperature, can anyone help??

ericmark
Project Manager
Project Manager
Posts: 2869
Joined: Fri Oct 02, 2009 9:49 pm
Location: Llanfair Caereinion, Mid Wales.

Re: S-Plan Heating Wiring Problem With Boiler Pump Still Running

by ericmark » Tue Jul 31, 2018 7:37 pm

Normally boiler and pump come on together, the thermostats work the valves, and the valve micro switches work boiler and pump.

2 posts   •   Page 1 of 1