I used up a bag of bonding on this job for a base on new blockwork, old revealed blockwork/galv steel wiring conduits (plaster knocked out, wiring in under steel), and concrete lintel. I still need to build up to 6 mm in some areas on top of the bonding (which has now dried off for a week and is scr...