Hi this is a first post for me. I have dug all the topsoil down to approx 18'' in my 6x8m lawned front garden with a view to putting down MOT type 1 limestone scalpings (40mm-dust) then gravelling But running along side an existing concrete slab drive I have found three service pipes, these\are: * a...