by htg engineer »
Fri Aug 10, 2007 9:55 pm
Why will it be above DPC ?
nothing should lie above the damp proof course, leave a gap and fill with gravel so that water can drain away freely, but try to keep turf level and gravel below DPC, not sure but i think its 150mm below