Water Regulation Drawings.. what is required
If you want to know how your DIY projects could be affected by building and planning regulations, click here to post questions and view answers

3 posts   •   Page 1 of 1
vdub
Labourer
Labourer
Posts: 4
Joined: Tue Apr 21, 2009 6:07 pm

Water Regulation Drawings.. what is required

Post by vdub » Tue Apr 21, 2009 6:14 pm

I require an existing mains connection spliting so I can have a seperate metered water supply. I phoned my Water supply company (Anglian water) and was sent out a form to fill in.

I am comfortable with most of the information requested but I do not know what is required on a Water Regulations Drawing. It also states to include all intended pipework layouts and a schedule of the proposed water fittings to be used.

Can anyone offer advice or know of an online resource that has the information

steve the plumber
Ganger
Ganger
Posts: 72
Joined: Mon May 04, 2009 9:32 pm

Post by steve the plumber » Tue May 05, 2009 9:39 pm

The water company should be doing this, not you as they will need to fit the meter.

vdub
Labourer
Labourer
Posts: 4
Joined: Tue Apr 21, 2009 6:07 pm

Post by vdub » Sun Oct 11, 2009 7:54 pm

Sorry should have explained. Drawings and fittings are for the house.

Found out that a scaled floor plan of house showing location of items using water.. sink, bath, toilet etc.... with a list of taps, copper pipe and fittings to be used showing their En numbers

3 posts   •   Page 1 of 1