by jondeau »
Wed May 23, 2007 9:10 am
Plumbing wise it's not difficult to do, simply a matter of fitting motorised valves to each zone.
The wireing of the control system is where it gets a bit more complex
and this depends on what level of control you want to have for your zones.
If you want each zone to have its own time switch and/or thermostat and the ability to switch the boiler on and off independantly, then you are looking at banks of relays and a lot of wireing.
Sounds like an interesting job........but a bit too far away for me I'm afraid.
JD, South Devon.