3.6 opening
Brickwork, drystone walling, render are a few subjects covered here. Click here to post questions and get answers

2 posts   •   Page 1 of 1
josh1
Apprentice
Apprentice
Posts: 7
Joined: Mon May 28, 2007 4:28 pm

3.6 opening

by josh1 » Mon May 28, 2007 9:06 pm

im going to take out a opening.the opening iis going to be about 3.6m wide.im not sure if the wall is carry just joists or its full load bearing wall.wat lintel would be best as 3.6m is quite a big opening,any ideas would help
thanks

thedoctor
Posts: 2530
Joined: Sat Apr 08, 2006 1:15 pm

by thedoctor » Thu May 31, 2007 8:10 am

Dont start until you are sure. See our projects on load bearing walls and forming openings in walls for full info on how to form an opening through a load bearing wall. A wall that is carrying joists IS a full load bearing wall as if its carryiong joists its also carrying the floor and everything that is on the floor. You are rerquired by law to notify the authorities if you are involved in structural alterations to your property and removing a load bearing wall is a structural alteration.

2 posts   •   Page 1 of 1
It is currently Fri Dec 27, 2024 1:46 am