I am creating a patio area with loose cotswold chippings on top of thin concrete with drainage on top of hard core on top of earth.
I intend to mix concrete via cement and 20 mm ballast and no sand simply to make sufficient hard bse to lay loose stone.
is cement and ballast suitable enough or do i need to add sand to help every thing bond ?