a friend of mine recently had his 1st fix inspection for Part P. the main route for the re-wire is through the first floor landing.
he has run his all his cables through holes in the joists, the Part P inspector has told him that he can not have any twists in the cables when running through the joists
he has told me that he has to take out all his cables and remove twists.
is this correct?
is it part of the regulations i have done a search and can't find any mention of it anywhere?
he also got told that all his cable have to be clipped to a joist, which is OK when you can get access but not when it is difficult to remove every floor board, does anyone know what is the mim requirement?