by AndyB »
Sun Jun 15, 2008 1:51 pm
I've been doing some major work on my house for the last year or so, including an extension. The extension being covered by building control. Included in the work are new electrics. The electrics are at the first fix stage at the moment. There will be a new consumer unit going in, and the second fix electrics, in the near future, but probably after the 17th edition deadline. Threrfore will my electrics need to pass the 16th edition or the 17th edition, for building control to be happy with, as the work was started last year.