Hi everyone, I'm laying a 4" reinforced concrete floor on a dpc membrane.
On top of that I have read I need to put another dpc before I put 4" of floor styrene to which I'm adding water underfloor heating and then a 4" screed to finish off.
My question is how long to let the first four inches dry out before I put the next layer of dpc. I read I need this dpc to protect the polystyrene. If I cover it before it's completely dried right through will I have problems because the moisture is trapped in or will it eventually dry out. Any advise is gratefully received. Thanks