Dry verge fixings

by rolthom » Thu May 31, 2007 12:48 am

Hi can anybody help I'm just about to tile my roof with interlocking modern concerte tile, I have been advised to use dry verge on the verges.
My question is that the instructions says that the battens should protrude from the wall 20mm but it dosen't say if this means after the wall has been rendered or before?. So any advice would be welcomed.

thedoctor
Posts: 2530
Joined: Sat Apr 08, 2006 1:15 pm

by thedoctor » Sat Jun 02, 2007 7:48 pm

Any verge overhang specified is an overhang to the finished wall, ie after the render.

rolthom
Apprentice
Apprentice
Posts: 6
Joined: Wed May 23, 2007 11:57 pm

by rolthom » Sat Jun 02, 2007 10:41 pm

Many thanks
Thought it was after the render but thought I'd better ask first.