FLOOR JOIST
Help, advice, information, answers and tips on all types of flooring from laminate and carpet to timber and vinyl

2 posts   •   Page 1 of 1
BOILER
Apprentice
Apprentice
Posts: 7
Joined: Sun Oct 17, 2010 9:47 pm

FLOOR JOIST

by BOILER » Sun Oct 31, 2010 10:36 pm

I have to drill a new vertical hole through a floor joist to accommodate a 15mm central heating pipe. The new hole is very close to an existing one and therefore would significantly reduce the joists strength in this region. Is there a metal strap commercially available to strengthen this region or can anyone suggest a solution?

Many Thanks.

BOILER
Apprentice
Apprentice
Posts: 7
Joined: Sun Oct 17, 2010 9:47 pm

Re: FLOOR JOIST

by BOILER » Tue Nov 02, 2010 12:11 pm

BOILER wrote:I have to drill a new vertical hole through a floor joist to accommodate a 15mm central heating pipe. The new hole is very close to an existing one and therefore would significantly reduce the joists strength in this region. Is there a metal strap commercially available to strengthen this region or can anyone suggest a solution?

Many Thanks.


I should have added that the joist is at the perimeter edge of a ground floor room, it almost touches the wall on one side, and the pipe is for a new radiator. Rubble is 600mm/24" below the flooring.

Thanks.

2 posts   •   Page 1 of 1
It is currently Mon Dec 23, 2024 12:59 pm