Hi ,
I am replacing my old bathroom rad with a heated towel rail. Is it absolutly imperative that I drain down my system prior to the swap over or can I use freeze spray onthe pipes?
My heating system is a 20yr old oil Worcester boiler , and my system is vented(at leat i think it is , it has header tanks in the loft)
Thanks